Nation-wide Outdoor Service Coverage
*Based on IDA's coverage performance surveys which included nation-wide outdoor drive test and areas such as housing estates/town centres, outdoor recreational areas and above ground MRT tracks.
Note: End users' individual experience may differ due to various reasons such as model of handset used, handset settings, number of users in the vicinity, etc.
Call Success Rate
Note: Call success rates are based on the mobile telecommunication operator's actual network traffic logs.
Call Drop Rate
Note: Call drop rates are based on the mobile telecommunication operator's actual network traffic logs.
In-building Service Coverage
IDA's Performance Survey Period: Q1 2016
M1 |
SingTel Mobile |
StarHub Mobile |
---|---|---|
No of buildings passed/No of buildings tested |
||
60/60 |
60/60* |
60/60 |
Note: The same sixty buildings were tested across the three mobile operators. The performance of each of the mobile operator varies for each of the building tested. End users' individual experience may differ due to various reasons such as model of handset used, handset settings, building/unit structures, number of users in the vicinity, etc. The in-building service coverage results are based on IDA's coverage performance surveys.
*The updated performance survey results before or after the four-month rectification period.
Tunnel Service Coverage
IDA's Performance Survey Period: Q1 2016
M1 |
Singtel |
StarHub |
---|---|---|
Compliance standard: >95% for existing road and MRT tunnels; and >99% for all new road and MRT tunnels* |
||
Central Expressway (Road Tunnel)* |
||
Pass |
Pass |
Pass |
Kallang-Paya Lebar Expressway (Road Tunnel) |
||
Pass |
Pass |
Pass |
Fort Canning Tunnel (Road Tunnel) |
||
Pass |
Pass |
Pass |
Woodsville Tunnel (Road Tunnel) |
||
Pass |
Pass |
Pass |
Marina Costal Expressway (Road Tunnel) |
||
Pass |
Pass |
Pass |
North South Line (MRT Tunnel) |
||
Pass |
Pass |
Pass |
East West Line (MRT Tunnel) |
||
Pass |
Pass |
Pass |
Circle Line (MRT Tunnel) |
||
Pass |
Pass |
Pass |
North East Line (MRT Tunnel) |
||
Pass |
Pass |
Pass |
Downtown Line (MRT Tunnel) |
||
Pass |
Pass |
Pass |
*Where deployment work for telecommunication infrastructure within the road and MRT tunnels was committed by mobile operators after January 2012, IDA will consider these tunnels to be new tunnels for the purpose of QoS measurements. Therefore, even though the Central Expressway is not a new road tunnel, the mobile operators have carried out upgrading works in the CTE after January 2012, and the higher standard of >99% applies. The rest of the tunnels listed above will continue to be subject to the standard of >95%.
Note: End users' individual experience may differ due to various reasons such as model of handset used, handset settings, number of users in the vicinity, etc. The tunnel service coverage results are based on IDA's coverage performance surveys.