Nation-wide Outdoor Service Coverage
*Based on IDA's coverage performance surveys which included nation-wide outdoor drive test and areas such as housing estates/town centres, outdoor recreational areas and above ground MRT tracks.
Note: End users' individual experience may differ due to various reasons such as model of handset used, handset settings, number of users in the vicinity, etc.
Call Success Rate
Note: Call success rates are based on the mobile telecommunication operator's actual network traffic logs.
Call Drop Rate
Note: Call drop rates are based on the mobile telecommunication operator's actual network traffic logs.
Tunnel Service Coverage
IDA's Performance Survey Period | M1 | SingTel Mobile | StarHub Mobile | |
---|---|---|---|---|
No of buildings passed/No of buildings tested Compliance standard >85% per building |
Q2 2013 |
60/60* (retest results, original test result in Q2 2013 was 41/60) |
60/60* (retest results, original test result in Q2 2013 was 50/60) |
60/60* (retest results, original test result in Q2 2013 was 57/60) |
Note: The same sixty buildings were tested across the three mobile operators. The performance of each of the MTO varies for each of the building tested. End users' individual experience may differ due to various reasons such as model of handset used, handset settings, building/unit structures, number of users in the vicinity, etc. The in-building service coverage results are based on IDA's coverage performance surveys.
Tunnel Service Coverage
IDA's Performance Survey Period - Q2 2013 |
Compliance standard | M1 | SingTel Mobile | StarHub Mobile |
---|---|---|---|---|
Central Expressway (Road Tunnel) | >95% for existing road and MRT tunnels | Pass | Pass | Pass |
Kallang-Paya Lebar Expressway (Road Tunnel) | Pass | Pass | Pass | |
Fort Canning Tunnel (Road Tunnel) | Pass | Pass | Pass | |
Woodsville Tunnel (Road Tunnel) | Pass | Pass | Pass | |
North South Line (MRT Tunnel) | Pass | Pass | Pass | |
East West Line (MRT Tunnel) | Pass | Pass | Pass | |
Circle Line (MRT Tunnel) | Pass | Pass | Pass | |
North East Line (MRT Tunnel) | Pass | Pass | Pass |
*For new tunnels where deployment work was committed by mobile operators after 26 January 2012, a higher standard of >99% applies.
Note: End users' individual experience may differ due to various reasons such as model of handset used, handset settings, number of users in the vicinity, etc. The tunnel service coverage results are based on IDA's coverage performance surveys.